Project 3.1:Guangzhou Electric Locomotive Frame Painting Project
Project Overview
-
ClientChina Railway Rolling Stock Corporation (CRRC)
-
LocationGuangzhou
-
Year Completed2019
-
IndustriesAuto Tier 1
-
BrandsABB
-
CategoriesPainting
-
SolutionGreenfield
Project Highlights
The Guangzhou electric locomotive frame painting line uses a rolling bed to transport workpieces into the spray room, where a hydraulic lifting platform raises or lowers the workpieces to different positions for efficient coverage.
The painting is completed using a fixed-point painting method by robots, ensuring over 90% effective coverage of the locomotive frame.
Construction was completed in 2018, and the painting line was put into use in 2019.
Scope of Delivery
Guideway Painting Robots:
Installed two IRB5500 guideway painting robots
Robot Guide Rails:
Installed two 10-meter IRB5500 robot guide rails
Spray Control System:
Installed two 2K spray control systems, integrated with robots
Electrostatic Air Spray Guns:
Installed two Lange electrostatic air spray guns
Spray Room Video Surveillance System:
Installed one video surveillance system for the spray room
Electrical Control System:
Installed one electrical control system
Paint Supply System:
Installed one paint supply system