•  

    (+86) 021-61181076

  •  

    info@jg-intelligent.com

Project 3.1:Guangzhou Electric Locomotive Frame Painting Project

Project Overview

  • Client
    China Railway Rolling Stock Corporation (CRRC)
  • Location
    Guangzhou
  • Year Completed
    2019
  • Industries
    Auto Tier 1
  • Brands
    ABB
  • Categories
    Painting
  • Solution
    Greenfield

Project Highlights

  • The Guangzhou electric locomotive frame painting line uses a rolling bed to transport workpieces into the spray room, where a hydraulic lifting platform raises or lowers the workpieces to different positions for efficient coverage.

  • The painting is completed using a fixed-point painting method by robots, ensuring over 90% effective coverage of the locomotive frame.

  • Construction was completed in 2018, and the painting line was put into use in 2019.


Scope of Delivery

  •  Guideway Painting Robots:

  •  Installed two IRB5500 guideway painting robots

  •  Robot Guide Rails:

  •  Installed two 10-meter IRB5500 robot guide rails

  •  Spray Control System:

  •  Installed two 2K spray control systems, integrated with robots

  •  Electrostatic Air Spray Guns:

  •  Installed two Lange electrostatic air spray guns

  •  Spray Room Video Surveillance System:

  •  Installed one video surveillance system for the spray room

  •  Electrical Control System:

  •  Installed one electrical control system

  •  Paint Supply System:

  •  Installed one paint supply system