Project 1.2: Jianghuai Yangzhou Plant Painting Line Upgrade Project
Project Overview
-
ClientJianghuai
-
LocationYangzhou, Jiangsu
-
Year Completed2023
-
IndustriesAuto OEM
-
BrandsFanuc
-
CategoriesPainting
-
SolutionUpgrading
Project Highlights
To enhance product quality and production efficiency, the interior spray stations for both base coat and clear coat were upgraded from manual to robotic painting to meet the needs of interior panel painting for the pickup truck series.
Designed production capacity of 22 Jobs Per Hour (JPH), with an annual production volume of approximately 85,000 vehicles.
Construction was completed during the 2023 Spring Festival, with the upgraded line entering mass production thereafter.
Scope of Delivery
Base Coat Interior Painting Station:
Installed three FANUC P-250iB/15 painting robots
Installed four FANUC P-20iB door-opening robots
Installed one FANUC P-250iB lid-painting robot
Installed two sets of FANUC P-20 30FT door-opening robot tracks
Installed three SAMES PPH707 Air atomizers
Performed a steel platform structural modification
Clear Coat Interior Painting Station:
Installed two FANUC P-250iB/15 painting robots
Installed four FANUC P-20iB door-opening robots
Installed one FANUC P-250iB lid-painting robot
Installed two sets of FANUC P-20 30FT door-opening robot tracks
Installed two SAMES PPH707 Air atomizers
Performed a steel platform structural modification