Project 4.3:Jianghuai Automobile Hefei Factory Relocation and Upgrading Project
Project Overview
-
ClientJianghuai
-
LocationHefei, Anhui
-
Year Completed2022
-
IndustriesAuto OEM
-
BrandsFanuc
-
CategoriesPainting
-
SolutionUpgrading
Project Highlights
According to the requirements of Jianghuai Automobile, seven FANUC P250iA robots and their corresponding accessories from the painting workshop of Hefei Peach Blossom Factory were relocated to Qingzhou (Shandong), Fuyang (Anhui), and Hefei Xingrui factories.
The robots were modified and integrated into the existing production lines of each factory to support capacity expansion.
Construction took place in 2021, and production began in 2022.
Scope of Delivery
Qingzhou Factory
Robot Relocation and Integration:
Relocated two FANUC P250iA robots and integrated them with the paint station of Qingzhou Factory for two-pass color paint spraying
Production Capacity:
Achieved a production cycle of 30 Jobs Per Hour (JPH), with an annual output of approximately 80,000 vehicles
Anhui Fuyang Factory
Robot Relocation and Modification:
Relocated two FANUC P250iA robots
Modified two robots to meet the requirements for water-based paint spraying
Additional Equipment:
Added two SAMES external electric atomizers
Changed the coating process from 3C2B to B1B2
Integration:
Integrated the modified robots in Station B1
Production Capacity:
Achieved an annual output of approximately 40,000 heavy truck bodies
Hefei Xingrui Factory
Robot Relocation and Modification:
Relocated three FANUC P250iA robots
Integrated one robot into the varnish station of Xingrui Factory
Modified two robots to meet the requirements for water-based paint spraying and integrated them into the paint station
Additional Equipment:
Added two Langley external electric atomizers
Production Capacity:
Achieved an annual output of approximately 40,000 buses